Tuesday, September 22, 2009

IPD Essentials: Model-based design

State-of-the-art use of building information modeling (BIM) today encompasses creating a design intent model (e.g. Revit Architecture), a structural analysis model (e.g. Tekla), an energy performance model (e.g. IES), a constructability and quantity take off model (e.g. Vico), a space program model (e.g. Trelligence), a facilities management model (e.g. Archibus), a coordination model (e.g. Navsiworks), and more.

IPD project teams need to embrace the reality and the associated challenges of managing multiple purpose-built building information models (BIMs).

(As a quick aside, the “the great debate” of April 2003, hosted and moderated by LaiserinLetter editor Jerry Laiserin, speculated on the future role of BIM. Wind the clock forward and the vision of a federated project model has prevailed over the alternate concept of a single building model. It is fascinating to observe that while Bentley was promoting the correct vision in 2003, it has been Autodesk that has promoted the most commercially successful product.)

So much has already been written about the now-proven advantages of using BIM that I do not want to regurgitate them here. Suffice to say that BIM and its close relative, virtual design and construction (VDC), are both essential ingredients to achieving integrated project delivery (IPD). In fact, certain IPD contracts actually dictate that the project team must use BIM.

Instead, I want to offer you a different perspective. Adopting BIM is not just about training your staff on how to use a particular BIM system. Rather it is about transforming your firm’s best practices from being drafting- and document-centric to implementing new and still-to-be-refined model-based design processes. What exactly does this entail ? I think as an industry we are all still working out the full meaning of that question, but there are some key lessons that have already been learned that offer great guidance:

  • BIM is not synonymous with IPD – it is only one of 5 Essential Ingredients.
  • Two different approaches – either ‘sharing the model’ or ‘exchanging model views’ – are currently being used each with a different set of pros and cons.
  • The letter “I” is the most powerful part of BIM - should this information be locked into a proprietary file format ?
  • In the world of a federated project model it is important to focus on the purpose-driven exchange of project information between different purpose-built BIMs.
  • Virtual building models allow early prototyping and simulation as additional inputs to the design process.
  • Integrated project delivery remains a function of people, process and tools.
  • Model-based design is not just about geometry, but about arriving at a common understanding of the intersection of disciplines, the interaction of building fabric and systems and the involvement of everyone on the project team.

You are invited to join our conversation as we continue to explore these ideas in future posts on this Newforma Blog and on PIM in the UK, our sister blog authored by Tim Bates.

Tuesday, August 11, 2009

Alphabet Soup (or acronym hell ?)

Do you get confused or just plain frustrated when you are reading the industry press reporting that AIA, CURT and AGC have formed the 3XPT Strategy Group, GSA has published an IFC based MVD requirement for BIM concept models, NBIMS is adopting IDM, CSI is supporting the IFD Library and promoting PPD, AGC has published agcXML, ICC is developing Smartcodes, AIA TAP recommends using MPS, NIBS is sponsoring COBIE, or by all of the references to IPD, LEED and VDC. If you are an international reader, just substitute your local variations such as Avanti, be2camp,CIB, CRC, etc.

Regretfully, here at Newforma we too have been guilty of speaking in acronyms on occasion. For example, in December 2008 we sent you an email blast entitled “PIM and the DNA for IPD” inviting you to join us for a free webinar …. when what we really wanted to talk to you about was
email management as an integral part of the project delivery process and to show you how firms like yours are tackling out-of-control inboxes to mitigate risk by capturing email decision trails and to improving team communication.

Through this blog we will be making every effort to demystify much of the industry jargon rather than just pile on and add to your confusion. We aim to be diligent about explaining exactly what the most important acronyms stand for, convey a fundamental understanding and provide an informed opinion regarding the importance of the specific project or initiative. As a start down that path, the links provided above (for anyone who wants to take the time to explore them) have been carefully selected to point you to an authoritative source that explains who or what is behind each of the acronyms used as examples above.

If we do err again, please call ‘foul play’ to get us back on track :-)